Get a Free Quote

process & installation

Countertop & Backsplash Removal

New stone needs clear, undamaged cabinets to sit on. We lift out your existing countertops and backsplash, protect the cabinets that stay, and haul the old material away.

About Countertop & Backsplash Removal

Removal clears the way for a countertop replacement, and how it goes depends on what you have now. Laminate tops are usually screwed to the cabinets from below and come off in large sections. Tile, solid-surface and stone tops are bonded in place and have to be cut or pried free, which takes longer and makes more debris. Photos sent with your quote request help us plan for it.

If your cabinets are staying, they need to come through removal intact. We release fasteners and cut through adhesive rather than forcing tops off, and protect cabinet faces and nearby floors as we work. Old stone is heavy and can crack unpredictably as it comes free, which is one reason to leave this part to a crew with the right tools. Everything we remove is then loaded out and taken away for disposal.

Tile backsplashes need a different approach. Tile is usually bonded directly to the drywall, and the paper face of the board often tears as the tile comes away. Plan for some patching, or new drywall, before a new backsplash goes up. A full-height stone backsplash needs a flat, sound wall, so once the tile is off, we look at the wall and tell you what work it needs.

At a Glance

Ideal for
  • Laminate-to-stone upgrades
  • Full kitchen renovations
  • Tile backsplash replacements
Timeline
Scheduled around your templating and installation dates; we confirm the day with you.

the benefits

Key Benefits

  • Removal and Disposal

    Old countertops, tile and debris leave with us, so there is nothing left for you to dispose of.

  • Care for What Stays

    We work around the cabinets, walls and floors you are keeping, and cover what could be scratched.

  • Timed with Your Project

    We coordinate removal with templating and installation, so your kitchen is out of use as briefly as we can manage.

  • Ready for New Stone

    We leave the cabinet tops swept and clear, so templating or installation can go ahead.

how it works

The Process

  1. 01 .

    Send a few photos

    Photos of your counters and backsplash show us what they are made of and how they are fixed.

  2. 02 .

    Plan the day

    We set the removal date around your templating and installation, and agree what is disconnected beforehand.

  3. 03 .

    Remove with care

    We lift out the old tops and tile, protecting the cabinets, walls and floors that stay.

  4. 04 .

    Haul it away

    Old material and debris leave with us for disposal, and the cabinet tops are left clear.

  5. 05 .

    New stone goes in

    Your new countertops are templated and installed on the dates we set together.

questions

Common Questions

All questions
What does countertop and backsplash removal include?

It covers taking out your existing countertops and backsplash and carrying the old material and debris away for disposal. Before we start, the sink, faucet and cooktop must be disconnected and the water shut off. We confirm who takes care of that when we prepare your quote.

Can I keep my existing cabinets under new stone?

Often, yes. Sound, level base cabinets can usually carry stone, although it is much heavier than laminate. Cabinets that sag or have water damage may need repair first, and deeper overhangs for seating may need support brackets. We point out anything we notice when we visit, so you can plan for it.

How long does a project take?

Most projects take 5–10 days from template to installation, depending on the stone, the measurements and site conditions.

free quote

Get a Free Quote

Tell us about your project and we'll be in touch within 24 hours. Every quote is free and backed by our best‑price guarantee.

613-983-0663

All fields are required.

Rough measurements, materials you like, timing — anything that helps.

explore

Other Services

All services

Process & Installation

Laser Templating

Laser measurement for complex layouts, so curved and angled runs fit exactly.

Process & Installation

Professional Installation

Precise levelling, clean seams and a tidy site, backed by our 3‑year labour warranty.

Countertops & Surfaces

Granite Countertops

Natural stone with a pattern no other slab shares, cut and finished for kitchens that work hard.